Skip to content
KaburaTiling Group

Protection

Waterproofing

Wet-area waterproofing completed properly, before anything covers it up.

The work

Waterproofing is the layer nobody sees and the one that decides whether a bathroom lasts. It has to be continuous, correctly detailed at every junction, and given the time it needs to cure before tiling starts.

Corners and wall-to-floor junctions are reinforced, penetrations are sealed, and coats are applied to the required thickness rather than the required appearance.

What’s included

  • 01Surface preparation and priming
  • 02Bond breakers and reinforcing at junctions
  • 03Sealing of penetrations and floor wastes
  • 04Multi-coat application to wet-area requirements
  • 05Cure time before tiling begins

Free quote

Tell us about your project.

Send through the room, the rough size and a few photos. We will come back with a considered quote — not a number pulled out of the air.

Free QuoteCall