Skip to content
KaburaTiling Group

Installation

Floor Tiling

Level, lippage-free floors set out so the cuts land where they should.

The work

A floor shows every millimetre of error. Lippage between tiles, a joint that drifts across a room, or a cut that finishes at 20mm in the most visible corner — those are set-out decisions, not installation accidents.

We measure the room before we start, dry-lay where it matters, and use levelling systems on large formats so the finished surface reads as one plane.

What’s included

  • 01Floor levelling and self-levelling compounds
  • 02Set-out to balance cuts and align joints
  • 03Levelling clip systems on large formats
  • 04Thresholds, transitions and trims
  • 05Movement joints where required

Free quote

Tell us about your project.

Send through the room, the rough size and a few photos. We will come back with a considered quote — not a number pulled out of the air.

Free QuoteCall